Jack8745 Posted February 17, 2009 Report Share Posted February 17, 2009 RIP kit first? well i guess im at the back of the list then, lol. off topic- any word on the motor mount lucky right behind you. well looks like its going to be a WHILE before we can get this, if ever. hard enough to get 20 people with stock :( Link to comment Share on other sites More sharing options...
Ipd Posted February 18, 2009 Report Share Posted February 18, 2009 FMIC vary too greatly to confirm fitment, so I'd say likely not. However if the routing is similar to Ipd RIP kit then maybe. Link to comment Share on other sites More sharing options...
lookforjoe Posted February 19, 2009 Author Report Share Posted February 19, 2009 Do we have twenty people yet? I won't even get a finalized quote or send a drawing until I have at least that many as I (Ipd) have to commit to 50 units for a minimum production run.Lead time would be likely 6 weeks, folks would pay once the product arrived at Ipd, would start with RIP kit coupler first then the factory coupler with IAC hose.So that means 20 of EACH style before we can continue...Don't mean to come off too abrasive here but I just want to be clear how it works Thanks!What does that look like? Lucky, I think you should have clarified that before I started the thread. I didn't mention anything about RIP version. Link to comment Share on other sites More sharing options...
GeraldJ Posted February 19, 2009 Report Share Posted February 19, 2009 Once I make the frankin hose I wont want the IPD one. It looks like its going to be months if not years before this ever gets done. Link to comment Share on other sites More sharing options...
lookforjoe Posted February 19, 2009 Author Report Share Posted February 19, 2009 Once I make the frankin hose I wont want the IPD one. It looks like its going to be months if not years before this ever gets done.I can wait, since I've already made one I mainly want to reduce the number of potential leak points.. Link to comment Share on other sites More sharing options...
GeraldJ Posted February 19, 2009 Report Share Posted February 19, 2009 I can wait, since I've already made one I mainly want to reduce the number of potential leak points..Im still in for one, blue or black. If I could get someone to send me GOOD PICs or bottom rip pipe for a few weeks Id want the rip part. Link to comment Share on other sites More sharing options...
Ipd Posted February 19, 2009 Report Share Posted February 19, 2009 What does that look like? Lucky, I think you should have clarified that before I started the thread. I didn't mention anything about RIP version.Granted, the RIP version is already in production, (manufacturer said they could modify a mold so mins are not a real issue, just had to send of some specs... So I'm not as worried about it and it doesn't weigh that heavily into the equation.For stock replacement hose with IAC line and larger T body opening the situation is still the same.Need 20 folks to commit to a single color then we can go into production.Is there a list of who has committed?Perhaps time to start one... Link to comment Share on other sites More sharing options...
Jack8745 Posted February 20, 2009 Report Share Posted February 20, 2009 Is there a list of who has committed?Perhaps time to start one...see first post in topic (page 1) Link to comment Share on other sites More sharing options...
xiu-qin854R Posted February 20, 2009 Report Share Posted February 20, 2009 I'm in at Blue hoses.If production starts at Black hoses, Lucky, could you prepare optional color of hoses with extra $$?This elbow hose and also pipe is not only good for gain any hp but also looking of engine view.In addition, I don't think that it's expensive one with used 960TB.You can Get More HP, Good lookin' of your engine room with cheap cost and some of your time for DIY, come on! Link to comment Share on other sites More sharing options...
Jack8745 Posted March 3, 2009 Report Share Posted March 3, 2009 is this dead then ? Link to comment Share on other sites More sharing options...
bum2kev Posted March 3, 2009 Report Share Posted March 3, 2009 no one really started numbering....1.kevin (RIP hose)2.3.4. Link to comment Share on other sites More sharing options...
Jack8745 Posted March 3, 2009 Report Share Posted March 3, 2009 no one really started numbering....1.kevin (RIP hose)2.3.4.yeah its done on the first page Link to comment Share on other sites More sharing options...
bum2kev Posted March 3, 2009 Report Share Posted March 3, 2009 yeah its done on the first pagewow im out of it lol...he must have been editing...cause i didnt ever go back to the first post :P Link to comment Share on other sites More sharing options...
1997850T5R Posted March 5, 2009 Report Share Posted March 5, 2009 Count me in for a blue one, I guess I can make a cheap temporary one. Link to comment Share on other sites More sharing options...
TorontoR Posted March 5, 2009 Report Share Posted March 5, 2009 i'm down too1.kevin (RIP hose)2.TorontoR (blue elbow w/o RIP)3.4. Link to comment Share on other sites More sharing options...
Recommended Posts
Archived
This topic is now archived and is closed to further replies.